top of page
The Four Missing Details — an illustrative composite with modelled outcomes. A solid-wall home with loft insulation, insulation continuity, glazing assumptions and unwanted air gaps to investigate. Verified inputs and suitable measures modelled a route from D63 to B81.
See the full investigation: dive into the evidence, tests and results for The Four Missing Details.

The Four Missing Details

An illustrative composite — modelled outcomes

The challenge

A Victorian solid-wall house had a lower EPC rating than its owner expected. They had already made several upgrades. Why did the rating still come out at D63?

What we investigated

We reviewed the house from top to bottom, checking the evidence behind the EPC and testing the assumptions that could affect the result.

What we discovered

Four details mattered here: the depth of the loft insulation, gaps in the insulation, the assumptions about the glazing, and unwanted air gaps around the loft hatch.

The modelled route

We checked the glazing evidence and modelled improvements to the loft insulation and hatch. With verified inputs and suitable measures, the modelled rating moved from D63 to B81.

What this case teaches

Small details can add up. Checking where the insulation stops and where air can escape gave us a clearer picture of what this house needed.

Good Advice. Better Decisions

01256 975 995 / 07879 653 745

Every Good Survey Begins With Good Questions

The EPC Fellas workshop hat filled with surveying tools

The Four Missing Points.

A small gap needs a careful diagnosis. An illustrative composite. Outcomes are modelled.

The Four Missing Details

An illustrative composite — modelled outcomes

The challenge

What is holding a solid-wall home below its target, and which inputs deserve another look?

What we investigated

Loft insulation, insulation continuity, glazing assumptions and unwanted air gaps.

What we discovered

Four small issues were adding up to significant heat loss.

The modelled route

Targeted improvements modelled a route from D63 to B81.

What this case teaches

Insulation continuity and unwanted air gaps need evidence. EPC outcomes depend on the building and verified inputs.

See the full investigation

Explore the evidence, tests and modelled route.

View the illustrated investigation →

Back to From the Workshop

Choose the help you need.

The question

What is holding a solid-wall home below its target, and which inputs deserve another look?

What we looked at

Loft insulation, insulation continuity, glazing assumptions and unwanted air gaps.

What modelling showed

Verified inputs and suitable combinations of measures offered a modelled route forward. This is not a promise for another home.

Find the cause before choosing the cure.

Insulation continuity and unwanted air gaps need evidence. EPC outcomes depend on the building and verified inputs.

Good Advice. Better Decisions

01256 975 995 / 07879 653 745

Every Good Survey Begins With Good Questions

bottom of page