
Illustrative cases. Modelled routes. Better decisions.
From the Workshop
These illustrative composites draw on observations and modelling across properties. They show our approach rather than completed work on one home.
Explore the evidence, possible measures and modelled routes. Outcomes depend on each building and verified EPC inputs.
Learn from practical examples before spending on yours.
Illustrative Cases from the Workshop


The Four Missing Points

Challenge:
Solid-wall home with an unexpectedly low EPC.
Discovery:
Four small issues were adding up to significant heat loss.
Outcome:
Targeted improvements modelled a route from D63 to B81.
The Oil Cottage

Challenge:
Old oil boiler, high bills and poor comfort.
Discovery:
Heat loss and outdated controls were the main culprits.
Outcome:
Fabric and control improvements modelled a route to C69.
The Fireplace House

Challenge:
Open fires make the EPC harder.
Discovery:
Heat escaped through chimneys and draughts.
Outcome:
Suitable flue and draught measures modelled a route to C72.
The Heat Pump House

Challenge:
Heat pump underperforming on paper.
Discovery:
Design and assumptions were not right.
Outcome:
Verified inputs and suitable measures modelled a route to B84.
The Storage Heater Champion

Challenge:
Electric flat assumed to need expensive fixes.
Discovery:
The electric strategy and tariff setup mattered most.
Outcome:
HHRSH and selective upgrades modelled a route to C74.
The Holding Pattern House

Challenge:
Owner wanted a C rating but major works looked costly and disruptive.
Discovery:
Some worthwhile gains existed, but bigger measures had not earned their place.
Outcome:
Modelling favoured modest improvements and a later review.

.png)








